Posts mit dem Label windgenerator werden angezeigt. Alle Posts anzeigen
Posts mit dem Label windgenerator werden angezeigt. Alle Posts anzeigen

Sonntag, 6. Dezember 2009

Work goes on at windturbe

After fixing/improving the help-construction for setting up the tower (big thanks to Ricky!) we decided to reduce the height to only 8m, because the second lifting-up testrun showed the forces are unrulable with that construction. The weight of the top (120kg) is too heavy in respect of the lever-arm (14m). We plan to remove one 6m-part of the mast.